Post-construction and pre-commissioning cleaning
Construction dust, packaging and debris migrate into airflow paths and settle on new equipment. We clean in phases alongside the build, toward a white-space-ready turnover clean, with particle counts to document the result when verification is included.
Spec sheet
- What it covers
- Phased cleans: initial (rough), progress, final, then a white-space-ready turnover clean
- Overheads, cable trays and containment
- Rack and cabinet exteriors
- Top-of-floor and subfloor (raised floor or slab)
- Post-installation cleans after cabinet, cabling or equipment installs
- How it runs
- Sequenced to the GC’s schedule and site rules. The method statement is approved before mobilization; work areas, tile lifts and stop-work rules are defined in writing.
- What you receive
- A written method statement, a completion record per phase, and (with verification) before-and-after particle counts reported against ISO 14644-1 classes.
- Scope note
- Not offered: zinc-whisker remediation or slab sealing. We’ll point you to a specialist.
How every engagement runs
- STEP 01
Walk-through
We walk the space with your facilities lead and agree what’s in scope: rooms, floor type, access windows, escort and MOP requirements.
- STEP 02
Method statement
Before anyone enters the room you receive a written method statement: sequence, areas, materials, tile-lift plan, and stop-work rules. Nothing starts until you approve it.
- STEP 03
Clean
Hearth & Hall works top-down and to the plan. No blowers or compressed air. Damp, never wet, and no wax or finish on raised-floor tiles. Tile lifts are limited to a few adjacent tiles at a time.
- STEP 04
Count & report
PMCS takes airborne particle counts and issues a written report.
Other services
Tell us about your room
Square footage, raised floor or slab, and the windows you can give us. We reply by email with next steps. Every engagement is scoped and quoted in writing after a walk-through.